Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is Ith current?

Answer Posted / barkha jha

Ith is thermal overload current
Ith = .90Iflc

Is This Answer Correct ?    7 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Dear Respected sir how to test ABB REX521 protection relay by relay tester.

2747


Explain and give me an example of a time when you had to explain some new procedures to your co-workers for quality service delivery, how did you go about it?

1970


at work i have a genertor/alternater what is the easyest way to work out if it is dc or ac?

1883


What should be the protection scheme for a 15kw, 3-phase motor working in a lathe machine.

2067


distribution is maximum done by a)radial b)network c) parallel d)b & c

2015


1)How much current can a 3-1/2 core 100 mm wire carry? 2)What are the special cables required for explosion proof wiring? 3)In case you do not have coal and salt for earthing, how can you achieve good temporary earthing? 4)One horse power single phase motor is more likely to get hot than a one horse power 3 phase motor. Is it true or false, if true why? 5)What are the different types of soft starters for large motors?please explain?

4648


What is the previous name of Cox's Bazar

1989


what happen if field of dc shunt motor opens? what is function of putting res. in parallel to one phase of 3 phase IM? the power supplied by 5A source in circuit is given by------Watt.

2055


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1795


How is the speed of a DC shunt motor related to the armature current?

1183


what is transistors comprised of?

1179


How can i get my certificate of competency as an electrical supervisor? I have complicated my B.Tech from Uttarakhand technical university this year (2012).

4517


Define branch?

1094


What are stable systems?

1098


How to protect a Dosing pumps/any sensitive equipment (single phase) from surge protection inside a food factory.

1748