At which stage is your implementation project currently? Are
you involved in Documentation of your project? At present
are you in data transfer stage? What does data transfer means?
Answer Posted / sam
1}IN SAP IMPLEMENTATION WE FOLLOW ASAP
METHODOLOGY.GENERALLY SAP CONSULTANT INVOLVEBED IN BBP
(BUSINESS BLUE PRINT PHASE)
THIS IS CALLED DOCUMENTATION.
2}DATA TRANSFER STAGE MEANS BEFORE GO-LIVE DATA IS
TRANSFERED TO SAP SYSTEM FROM NON-SAP SYSTEM THROUGH
BDC,LSMW. THIS IS CALLED CUT-OVER DATA AND PROCESS IS CUT-
OVER STRATEGY
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which block stops the system from creating the picking list?
what is difference between individual and collective requirement
what is the use of billing report
What is delivery document?
how can you do consignment in inter company sales?
Hi, Can anyone proivde the soluiton for the below senirio, thanks in advance. We are providing test services to various sites of a corporate. Now, we want to bill as a single bill point i.e. Corporate office. Single bill for each site will be generated. E.g. Panac Labs, New Delhi Head Office Panac Labs, Mumbai Lab at Mumbai Panac Labs, Kolkata Lab at Kolkata Panac Labs, Indore Lab at Indore In above case, we are cattering services to all four locations. However, New Delhi is the Head office and Lab too. Hence we will issue four bills addressed to Panac Labs, New Delhi. Outstanding and debtors will be maintained on A/c of Panac Labs, Head office. We also want to maintain sub- ledger base on sites
Where is the logic that controls this and how do we change it?
What is the client no of SAND BOX.GOLDEN CLIENT, UNIT TESTING,ENDUSER TRAINNING AND PRODUCTION SERVER?????
What happens when a value is not entered for a manual and mandatory condition type and does a header condition type have an access sequence?
What are the effects of posting goods issue?
How to create the source and target database connections in the server manager?
What is the central organization element in purchasing and the relationship between sales organization and plants, company codes, plants and company codes?
Describe the shipping process for a cosignment of cargo loaded in continental Europe
How would you configure ‘partner determination procedure’? Explain
How many tickets you have solved till date? can you please elaborate it with solutions?