After synchronization with grid how to maintain the
power factor in lagging or in leading? if lead of lag what
is the problem?
Answer Posted / m.vasudevan
By using a capacitor bank ppower factor lagging or leading
can be maintained. Leadin power factor is the problem. If
Power factor is leading, the reactive power of total power
export to the grid is high and active power content will
become less.
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
Is it posible to instal one more SMDB from the existing SMDB and is it practical.
what is inter connected dc generator?
What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side
what do you mean by plant earthing system.
1.4 What is meant by CT knee point voltage and how would you determine it
1. If 8.35%Z means the percentage impedance of 132kV-line from power company, we will like to confirm its base capacity?
What is meant by positive and negative feedback?
is there any lightning by passer is arranged in ship like buildings?
Why do we need a separate control desk & PLC control panel in Boiler plant or coal handling plant? Can we provide cost effective Control desk cum PLC panel. Is there is an specific need for control desk.. kindly advice.
What happens if we connect a single phase energy meter in reverse polarity.
What is time invariant system?
i am electrical and elctronics engg passed out in 2009 want to attend for reliance placements.plz send me apttitude ,technical and hr question answers to my mail plz. my mail id-kat.bindas@gmail.com
electromechanical relay type identification example : type=tjmh t-stants for j- m- h-
What descriptive information does the NEC require to be marked on all conductors?
What is the different between conventional MCC and intelligent MCC? Common controller or controller for each bucket