Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

define defect lifecycle step by step

Answer Posted / samsirsameer

Bug Life Cycle:

Stage#1:
New: Test Engg finds a bug, drafts it and post in in Bug
Tracking system (BugZilla, PVCS, JEERA..ect)
Initially the bug is assigned to POC (testing) or TeamLoead
(development) or the test enggg directly assigns it to the
concerned developer (if he knows)

Stage#2:
i. Assigned: The Teamlead or POC or the tester himself (if
he is aware of teh developer working on that bug) assigns
the bug to the Concerned developer

OR
The POC or the development lead thinks that the posted bug
is NOT A BUG or NO PLAN TO FIX IN THIS RELEASE or
ENHANCEMENT (future request), he changes the status and
assigns the Bug back to the TEst Enginner. The TEst ENgg,
then closes the bug as per the lead/poc comments.

Stage#3:
The concerned Developer to whom the bug is assigned, will
look in to the isue
i.He may not be able to reproduce the bug. NOT ABLE TO
REPODUCE. He will assign it to the concerned test engg, the
test enginner willll verify and if repro he willl add his
comments (more detailed steps and assign) it to the
developer. If not reproduces, he will add conmmnents and
close it.

ii. Developer will fix and cnahe the status to
RESOLVED/FIXED and assigns it to Test Enginner

Stage#4:The test engg will reverify the bug in the fixed
build and if
it si fixed, he will add coments admn close it
if not fixed, he will add comments and assigns back to the
developer.

Again Stage#3 will come into picture and then Stage#4 until
the bug is verfied and closed.

Bug States:
New
Assigned
No plan to fix/Not a bug
Resolved/Fixed
NotFixed/Re-open
Fixed/Closed


Thanks, SamsirSameer
samsirsameer@gmail.com

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you do (with the project tasks) when the schedule fails?

3057


How would you test a service oriented architecture (soa) web application?

1138


What is the test harness?

1083


what are the types of Bug?

1528


Does an increase in testing always improve the project?

1790


List out test deliverables?

1102


You want a automation tool to be used for your project. How will you convince the client for the same. Please give me specific answer.

1905


What is Test methodology, Testing type , Testing approach, Testing technique & Testing methods. Explain with example.

1927


what are the risk factors in the project? what is the base for testplan and entry criteria ,exit criteria for test plan?

2420


how is market for testing in banglore,chennai,pune,delhi?

2218


what is metrics in software testing? give me a brief detail about it?

4845


how to write defects in excel sheets when defects occured

2005


Explain stub in testing point of view?

1145


how can u prepare the test plan?

2245


Can u give me explanation about section 508 testcase and Testcase for this section. It need a details checklist for the same Manimozhi

2680