Answer Posted / samsirsameer
Bug Life Cycle:
Stage#1:
New: Test Engg finds a bug, drafts it and post in in Bug
Tracking system (BugZilla, PVCS, JEERA..ect)
Initially the bug is assigned to POC (testing) or TeamLoead
(development) or the test enggg directly assigns it to the
concerned developer (if he knows)
Stage#2:
i. Assigned: The Teamlead or POC or the tester himself (if
he is aware of teh developer working on that bug) assigns
the bug to the Concerned developer
OR
The POC or the development lead thinks that the posted bug
is NOT A BUG or NO PLAN TO FIX IN THIS RELEASE or
ENHANCEMENT (future request), he changes the status and
assigns the Bug back to the TEst Enginner. The TEst ENgg,
then closes the bug as per the lead/poc comments.
Stage#3:
The concerned Developer to whom the bug is assigned, will
look in to the isue
i.He may not be able to reproduce the bug. NOT ABLE TO
REPODUCE. He will assign it to the concerned test engg, the
test enginner willll verify and if repro he willl add his
comments (more detailed steps and assign) it to the
developer. If not reproduces, he will add conmmnents and
close it.
ii. Developer will fix and cnahe the status to
RESOLVED/FIXED and assigns it to Test Enginner
Stage#4:The test engg will reverify the bug in the fixed
build and if
it si fixed, he will add coments admn close it
if not fixed, he will add comments and assigns back to the
developer.
Again Stage#3 will come into picture and then Stage#4 until
the bug is verfied and closed.
Bug States:
New
Assigned
No plan to fix/Not a bug
Resolved/Fixed
NotFixed/Re-open
Fixed/Closed
Thanks, SamsirSameer
samsirsameer@gmail.com
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What do you do (with the project tasks) when the schedule fails?
How would you test a service oriented architecture (soa) web application?
What is the test harness?
what are the types of Bug?
Does an increase in testing always improve the project?
List out test deliverables?
You want a automation tool to be used for your project. How will you convince the client for the same. Please give me specific answer.
What is Test methodology, Testing type , Testing approach, Testing technique & Testing methods. Explain with example.
what are the risk factors in the project? what is the base for testplan and entry criteria ,exit criteria for test plan?
how is market for testing in banglore,chennai,pune,delhi?
what is metrics in software testing? give me a brief detail about it?
how to write defects in excel sheets when defects occured
Explain stub in testing point of view?
how can u prepare the test plan?
Can u give me explanation about section 508 testcase and Testcase for this section. It need a details checklist for the same Manimozhi