How much does it cost for a R.C.C roof slab of size (25 X
20) given in feets using 1:2:4 concrete mix of M20?
Answer Posted / soumya
rate of M20 concrete per cum= Rs.2900
labour charge=250 rs
shuttering cost=300
total =2900+250+300=3450/cum
here area given as =25*0.3048*20*0.3048=46 sqm
assume roof thickness as 10 cm
there for Qty =46*0.10=4.6 cum
cost of rcc roof =4.6*3450=15870
| Is This Answer Correct ? | 55 Yes | 29 No |
Post New Answer View All Answers
how to identify np3 pipe and np4 pipe
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how calculate the bearing from two coordinates?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
procedure for preliminary selection of size of column of 5 storey building
How to make a c++ program that converts any base to base 10?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
Which is the direction of negative angle?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
what is column foundation
what discoveries did you have in relation to your course?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
What is construction mitigation management?
Why the statue of liberty is made of copper?