How much does it cost for a R.C.C roof slab of size (25 X
20) given in feets using 1:2:4 concrete mix of M20?
Answer Posted / soumya
rate of M20 concrete per cum= Rs.2900
labour charge=250 rs
shuttering cost=300
total =2900+250+300=3450/cum
here area given as =25*0.3048*20*0.3048=46 sqm
assume roof thickness as 10 cm
there for Qty =46*0.10=4.6 cum
cost of rcc roof =4.6*3450=15870
| Is This Answer Correct ? | 55 Yes | 29 No |
Post New Answer View All Answers
what is the difference between prime coat and tack coat in road construction
what's the formula for calculate pcc for matt(45mm aggregate)?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
how much of the strength comes from post-production curing
How can we convert weight batch to volume batch for m30 mix
Discuss some applications of modular elasticity?
What will be weight of 0.5mm GI sheet per sq.ft?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
What are the different softwares used for cad?
Explain what is 1/8 on the architect ruler denotes?
In case if concrete box girder bridges how is the number of cells determined?
how much used soil in 1 brick of standard size?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)