What is meant by single cycle plan ?how it works?

Answer Posted / sanjay tiwari

The Single Maintenance plan can be Performance Based or
Time based without any Maintenance strategy.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is purpose of serial numbers in sap pm module?

541


Why do you need an equipment and functional location both?

647


What is settlement profile?

543


Can I maintain two different units in a measuring point?

471


What is refurbishment process?

531






You want to distinguish between an equipment that has been charged or not charged for service. How would you do that?

468


What is the use of warranty claim processing function?

486


Is it possible to change the equipment category once created?

482


Which t code is used to create refurbishment process?

514


What is maintenance item?

512


What are the functions of using equipment master?

468


How pm module is integrated with co module?

536


Is maintenance plan a master data?

595


Can we assign one maintenance item to more than one maintenance plan?

513


How would you attach a drawing to the equipment master data?

506