What is meant by single cycle plan ?how it works?
Answer Posted / sanjay tiwari
The Single Maintenance plan can be Performance Based or
Time based without any Maintenance strategy.
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is purpose of serial numbers in sap pm module?
Why do you need an equipment and functional location both?
What is settlement profile?
Can I maintain two different units in a measuring point?
What is refurbishment process?
You want to distinguish between an equipment that has been charged or not charged for service. How would you do that?
What is the use of warranty claim processing function?
Is it possible to change the equipment category once created?
Which t code is used to create refurbishment process?
What is maintenance item?
What are the functions of using equipment master?
How pm module is integrated with co module?
Is maintenance plan a master data?
Can we assign one maintenance item to more than one maintenance plan?
How would you attach a drawing to the equipment master data?