9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement
Answer Posted / n.lakshmanan
9*9*.100=8.1m3
cement-26.244Bags
sand-67.29cft
40mm aggregate-134.58cft
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
how to calculate testing date
Define What glue is least sticky?
What is meant by cartesian coordinate system?
What is the diff between cad & cadd?
can i get civil engineering test papers.......?????
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
What is meant by autocad?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What is a tensile strength? What is the tensile strength of wood?
What is the Roll of Water Bonding under VDF road?
What are the different approaches in designing the floors of the service reservoirs?
What is thumb rule in quality and quantity estimation of a Residential building??
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40