When i went to a interview the interviewer ask me a
question for that i cant able to answer him if anyone knows
answer me
How will you design a capacitor bank for a plant? if my p.f
is 0.6 i have to improve it to 0.9 or 1 what kind of steps i
have to do? and is there any formula for calculating this?
Answer Posted / joel q.
You must add a capacitor bank. you can determine the size
of the capacitor to be added using the following formula.
KVAR = KW*Tan((arccos0.6) -(Arccos0.9))
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
Brief working principle of stabilizer,application & safety precautions
1 “earthing” for bonding of equipment and circuits to common plant earth electrode potential, 2 “protective earthing (PE)” when this bonding is required for personal safety provisions 3 “grounding” for interference suppressing bonding of screens, sys-tems with ground level 4. low-impedance earthing ? 5.primary earthing system and secondary earthing system what is that? 6.earthing electrode or mesh net earthing electrode ? very confusing , simple but very informative help required ? i will be very very thankful to you guys.
what is the minimum (Common factor) insulatin resistance of the following a, 4mm sq wire b, cable from 50 mm sq to 800mm sq
I have 1500/1A CT If i connect this CT in 6.6KV bus bar means what will be the voltage present in CT?
State superposition theorem?
How Load Factor, Demand Factor, Diversity Factor etc best applied in designing an electrical circuit? Is it allowed to consider these factors in each and every panel in an electrical distribution system? Can any body suggest a good book for reference?
How to resolve if Diesel generator stop while running ?
How to design the earth grid for lightning protection in an industry
would you please give me any idea about the BARC interview question on electrical? i have an interview on 1st july.....plz hlp me.......its urgent......
What are chief characteristics of state-space method and its techniques ?
working principle a.v.r. ?
How to select a cable size for particular load?
In our plant we have installed new MCC with ELR and CBCT which is detecting some leakage current in the system but it leading to some confusion when to check that in which feeder which is drawing current we put off the whole panel itself but still CBCT detecting some leakage current so can anybody ans me , where i am going wrong or how to detect whether its actual leakage or CBCT malfunctioning.
there are cam operated switches - why we call cam operated , What is cam ?
why single phase to grd test in HV cable?why not 2 phase at a time?