What is meant by single cycle plan ?how it works?
Answer Posted / sandeep tawar
Through Single cycle Plan youn Can create cycle sets for Ex
250 hr, 500 hr, 1000 hr etc with an equipment and maintain
one Measuring Counter with it and create measurnin counter
daily for that counter , as the counter rached nearer to
the cycle order ot notification will get generated as per
teh call horizon that you have maintained scheduling
parameter in the the plan, in the single cycle plan we have
to define cycles sets, and on counter compulsory wit the
equipmnet
Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
list the standard mis reports available in pm.
Is it a rule that you will use pm04 order type for refurbishment? Can you configure another order type for refurbishment?
Explain the meaning of equipment master?
How pm module is integrated with mm module?
A reservation is triggered from a maintenance order and user is trying to issue material from warehouse with reference to the reservation. But system is not allowing goods issue? What I need to check?
What are mttr and mtbr reports?
What level of functional locations should be changed for alternative labelling?
Which order type you use for refurbishment?
What is shift factor? Explain with example.
When do you perform breakdown maintenance?
How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?
I have scheduled a maintenance plan but I am unable to see the all due (plan) dates of maintenance order in schedule overview. Which setting will I check in maintenance plan?
what do you mean by measuring point?
Is maintenance strategy mandate for maintenance plans?
Which configuration setting allow a calibration order to trigger an inspection lot from maintenance order?