how do we calculate wastage of steel in the site,what r the
items to taken into account for wastage calculation?
Answer Posted / sjtbehera
wsstage calculation vary from large dia to small dia.
up to 20% we are taken 2.5%
above 20 dia we are calculate as 5%
| Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
importance of the soundness test to determine the quality of cement use for any construction
How to estabilish reinforcement Steel rolling margin for a building projects ?
What is portland cement
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
roll of DLC in road constructions
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
How to arrive d*d/162 , for finding the kg per meter , wt of steel
can you give me the details of rate analysis of steel and concrete?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
Name the main components of a cad gui?
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
which has high compressive strength between hollow block and brick masonry?