how do we calculate wastage of steel in the site,what r the
items to taken into account for wastage calculation?
Answer Posted / monu lal
total quantity of steel*5%
| Is This Answer Correct ? | 14 Yes | 9 No |
Post New Answer View All Answers
how to calculate the size of triangular ring in rcc column?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
explain what do you mean by the property development.
Explain moment of inertia and its importance.
what is the types of surveying?which type of survey carrying for type of work?
what is castigliano theaorem
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
What is meaning of tlc
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
what is shuttering co efficient?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com