Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

We have laid the single core Armoured cable 7 nos ( 2 each
phase & 1 neutral ) to cater our electrical load .
the issue is though we have Glanded the cable both the end
also givan the earthing to the panel both the end we are
facing a heavy sparking at the gland side. what could be
the reason.

Answer Posted / virendra

Dear Ravi,

we are having a load around 300 KW with 200 KW lighting
load & 100 KW of Motive load.

Also note that we have a stable system with balance load

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How calculated single phase induction motor req. Capacitor?

1584


Can anyone provide with a SLD for HT panel installation for a 33KV line and distribution end has three 1.5MV transformers. Is it suitable to use OCB or VCB and also provide me the suitable rating and its connection diagram.

3354


Which level of the Transformer oil got dielectric strengh? And why?

2253


What OPGW is better than Microwave or PLCC???

4129


List out the the types of Mounting Light fixture?

1612


how to calculate fuse rating for a motor

5656


What tests should i carry over on a newly rewinded DC Generator with voltage rating of 38 volts and current rating of 350 amps, to certify that the machine is OK?

1885


What are the disadvantages of thermal power plant?

1092


what is sevice settings for mccb?How can be it setted?

2231


A generating system will have a total capacity of 300 MW. Find the probable forced outage when the capacity is supplied by two 150 MW units. The operating probability of all units is P=0.98 and forced outage probability rate Q =0.02 .

2638


why moisture formation found in XLPE Armoured cable outer sheath

1818


Determine the BTU size of an aircon for 20 sq metre room

1879


in ring main system we use the isolater b/w transfer bus and main bus if we r not use isolatar than wat will be the effect in our sys.

2090


WHY BREAKER ARE USED IN SUBSTATIONS?

2236


Which test will be more severe for VCB?

2655