What is the role and reponsibilities of Electrical
Engineers in construction field?

Answer Posted / balaji

1.Ensure power supply available.save energy by disconnecting
unwanted loads.
2.ensure all electrical machines should be earthed ,because
in construction mostly related with steel structures,if any
leakage from machine then persons will get shock.
3.if work is going on outside protect machine by covering
that from rain fall.
4. make awareness to all people how to switch off power in
case of any electrical accident.

Is This Answer Correct ?    35 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

in dc suppy frequency is zero why? if dc frequency is zero how to exist dc transients and ac transients

1561


In ACS 1000 drive we are using 12 pulse converter,why don't use 3 pulse converter.

1556


When calculation of fault current and fault Kva is to be done,why always we use per unit value and why we consider the base kva?

1450


what is the basic need of domestic loads 1- voltage 2- current

1512


I'm looking for a mnaual set for a Teradyne J750. Softcopy would be preferred but I'll take what I can get.

1755






In between UPS out going changer over switch and ups raising main input, both side cable gland producing heat but the cable doesn't get heat,Why?

1724


What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.

1487


If breaker is undefined position, first step to do.

1794


from which subjects most of the technical que will b asked for hpcl(electrical).pls help me

1575


what will be the effect if you were using different brands of outlets?

1472


What will happen if i used 11KV earth ht kit to 11 KV / 11 KV cable termination?

994


How to select HT/MV cable size ?

2002


what are the protecyion of transformer & generators

1470


I want d.g.set our company

1328


Define cuttoff frequency?

678