In ECC6 can we change the number of dialog workprocesses
without restarting the system and with out using operation
modes?
Answer Posted / ganesh varma
Yes, we can by using the Transaction RZ11.
In RZ11 most of the parameters doesn't require restart of
the system.
| Is This Answer Correct ? | 3 Yes | 7 No |
Post New Answer View All Answers
What is the difference between developer trace, system log and system trace?
How to perform the transport?
What is a support package? What is its purpose?
Explain the developer trace?
What is transport domain?
Is it possible to install ecc 5.0 as a test system and not production, without installing solution manager?
describe where they would look at the buffer statistics, and what steps they would use to adjust them?
Explain deletion flag?
What are the daily activates?
How you will get help from OSS notes?
What is an “ok” code is and what is the difference between “t-code” and “ok” code?
Explain what is the purpose of tdevc ?
What is the difference between asynchronous and synchronous transport?
Where can you find a list of object keys included in a transport?
what are the main issues you faced in the implementation project?