How many bricks in one cubic meter?
Birck size 22.9*11.4*7.6 joint 12mm
Give me answer with calculations

Answer Posted / guest

Hi
R u aware of faloowing things
1:Naminal thickness and Actuval tickness of wall?
2;Dry volume of mortor ?
3: Extra mortor rqd forg filling ?
4:westage norms of different meteriels?
5:Standard jont thickness in maasonary wall if yes R u
aware of practical thk ness maintained by masons on site
All thise factores we have to considere then only we ll
able get rqd qty of metereal

PLs dot miss guied the people

Is This Answer Correct ?    8 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can you distinguish between sorption, absorption and adsorption?

754


What are the main reasons for conducting pull-out tests for soil nails?

725


What is a hatch patterns?

680


Differentiate first angle & third angle projection?

662


Mention different types of roof systems?

733






What is the formula for figuring out how many gallons of water are in a pipe by the foot?

660


what is mean by reestimation?

1365


Define What is rigging?

638


what are the ffactors you considered choosing the course?

1699


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

1586


in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.

1730


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

1721


at what pressure ply-wood is obtained by gluing wooden sheets

2103


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

1666


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1692