Answer Posted / satender
you have first of all Start stop the DG's in manual mode ,
then check the voltage biasing and speed biasing by running
it on load ( single unit ) . Then check the phase sequence
of DG's and then give the synchroniizing command
Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
Name the test signals used in control system
THERMAL CAPACITANCE IS MEASURED IN..................................................
What is lc oscillator?
1)we have 1000 cfm Blower,Dia-1Mtr,Velocity of air 94 m/s 2)We have Natural Air velocity 94m/s 3If i Put Wind Mill in natural air ,speed is 94m/s Then it will generate Assume 100kw 4)If i put same wind mill across the Blower,air speed is same 94m/s now the Question is Will it generate 100 kw?
High speed earth switch operation with diagram
What will be the voltage impact on secondary side of two transformers with different vector groups when both voltages are compared.
i have seen one 8.4 MW synchronous motor in a plant located in bellary it is fixed with brushless rotary rectifier ,anybody can explain its start up principle
How it can worked plc based electrical system And which type of software using.
hi frnz,can somebody give me any project work? i am a 2nd year student & interested in practical works...plz give me some projects
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
Define phase cross over?
IN MY SYSTEM THERE IS ONLY OVER CURRENT EARTH FAULT RELAY IS AVAILABLE. FOR THE UNBALANCE SENSING IS THERE ANY RELAY IS AVAILABLE? THE SAME CTs WHICH ARE USED FOR THE OVER CURRENT EARTH FAULT RELAY CAN USE FOR UNBALANCE ALSO?
how much excitation voltage required to generate 1mw power?
What are hrc fuses and where it is used?
i need about 10 years of GATE solved papers in pdf format and even mock tests toooo