Answer Posted / satender
you have first of all Start stop the DG's in manual mode ,
then check the voltage biasing and speed biasing by running
it on load ( single unit ) . Then check the phase sequence
of DG's and then give the synchroniizing command
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
What is the function of the circuit breaker failure relay?
what is errection pcbs?
what happens if dc supply is given and the remedies for it.
What is bode plot?
how to calculate the power factor when instantaneous voltage and current has harmonics in it ?
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating
what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)
What is meant by cold loop test in instrument
while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?
How the circuit breaker is selected for Induction motor of 100 kW, 415 volt, 0.85 power factor, 0.95 efficiency ?
During regenerative breaking= A rotating magnetic field is reversed B slip is positive C torque is positive D slip is negative
How to know of any cable size if there are not written on cabl?
what is the relation between knowing of the distance between power transformer and the capacitor feeder in case of parallel operation
what are the values of VRY,VYB,VBR,Vry,Vyb,Vbr,Vrn,Vyn,Vbn for Magenetic balance test of 100 KVA and 63 KVA Distribution transformer
can u give me a brief idea about power line carrier communication ??