If at site iam supposed to get M30.But by mistake i got M20
mix. How could I differentiate the mix before placing?
Answer Posted / pramod
In case of this thing u cannot differentiate the mix before
placing. If this is possible then client also check it out
before placing.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
How to testing voids of filled aggregate in bitumen mix design
Why do you want to work here
how to calibrate the RM 800
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
Specific gravity of cement?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What glue is least sticky?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
what do you know that m20,m25
how i can tak Quantity of mortar in block work
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
What is braced excavation all about?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.