Definition of grid?

Answer Posted / s,vivekanandan

Grid is the interconnected network of differnt Generating
Stations and Sub-Stations at various voltage levels for
distributing and consuming the generated electrical Power.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How much load can be taken for chiller from 1500 kva transformer

862


How to know th details about an electrical Drawing ? Please mention the easy method.

1997


substation+ plc system

1625


how to meas-our losses for L.T & H.T

1685


what is an unbalance in acircuit? in a three phase 3wire circuit how an unbalance will come? in a three phase four wire system how an un balance is coming?

1347






How to measure size of cable on a given load

1384


Pl.brief me about Electrical power distribution system from Main generating station to Industry.What is the use of in between station.

1594


how we sesign the transformer give some specifion regarding design of transformers

1470


c++ write a program to use a fuction call "max"which accepts an intger arrey of size5.as an arrument and return the larger and smallest of the arrey to main without changing. the original changing of the original position of the element of the arrey.

1470


What is the permissible maximum flux density in transformer core?

730


How to know Resistance and Reactance value of main and aux winding of single phase capacitor start capacitor run induction motor to find capacitor value?

1504


Is there possible to Test Transformer for Overfluxing Capability. Or is there any firm who does Overfluxing Test on Transformer?

2640


Why is voltage is required to be within permissible range for an electrical equipment?

1268


What is self exciting?

1268


Hello everyone, somebody knows what is a "surplice power" ? The hole phrase is: "This rating is appropriate for a generator set paralleled with an infinite bus e.g. a national electrical supply network or grid where the generator set is run at 100% load, 24 hours a day, 365 days a year and any surplice power is exported into the grid" Thanks in advance.

1262