Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate busbar size & what is the procedure we
make for determine that?

Answer Posted / sujata wagh

Generally current carrying capacity of Al. is 0.8A per
sqmm and Copper is 1.6A per Sqmm.

Suppose we need bus bar for 630A, and we are going with
Aluminium bus bar

= 80*10*.8=640A
where 80*10 is size if bus bar usually available is the
market.
so we can use 80x10sqmm al. busbar per phase for 630A.

for TPN- (3.5)x80x10


If we are going with Copper bus bar
than we will use = 40x10sqmm per phase

= 40x10x1.6=640A
where 40*10 is size if bus bar usually available is the
market.
so we can use 40x10sqmm copper busbar per phase for 630A.

for TPN- (3.5)x40x10

Is This Answer Correct ?    246 Yes 46 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Single line diagrams for star to delta and DOL starters.

2260


can anyone explain 11kV 3core cable megger,hi pot test procedure with connection details?

3266


3 shows a 415 V, 3-phase generator supplying a 3-phase 415/110 V transformer. Draw the individual and combined impedance diagrams to a base of 10 kVA. Determine the system fault kVA and the fault currents at the 415 V and 110 V busbars for short circuit faults on the transformer input or output terminals. Work in p.u. values of impedances.

2654


What is the rotor frequency of 10 Hp 1440 RPM 50HZ 415V ?

1920


Hi,I am working in abroad for more than 3 years in a company operating with 11kv and 6.4 MW power. I need c licence in India,can I? some other says only i can get if i work for 2 years in india only! anybody kindly clarify by doubt.Thanks

1846


How to detect voltage vector shifting in interconnection protection.

1899


when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.

2034


What do you mean by the zone of protection?

1088


what is difference between elr and R eartl realy.

2628


what is meant by the phrase 'static load' in case of shorting in a generator excitation system?

2131


What happen to the transformer if the OLTC frequently used for lower and raise occured 50times daily?

2035


What is meant by RVT and NDR ? expansion and details of it

3024


how to produsing geretor power

2201


c++ write a program to use a fuction call "max"which accepts an intger arrey of size5.as an arrument and return the larger and smallest of the arrey to main without changing. the original changing of the original position of the element of the arrey.

1910


If symmetrical fault occurs at the terminal of a synchronous motor then how the motor will act...explain it..

2130