THE 40 MW OF POWER FOR 220 V III PHASE POWER CONNECTION
REQUIRES HOW MANY KVA POWEER REQUIREMENTS
Answer Posted / jayaraj
The question is wrong. 40MW load could not be fed from 220v 3 ph system. If the question is the KVA requirement 50000KVA on .8 pf. So in a distribution system 2000KVA Transformer 25 nos are required.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to introduce yourself
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<
Can you explain about Restricited earth fault protection scheme
What is a single phase autotransformer?
WHAT WOULD BE THE FORMULA OF WIRE GAUGE FOR A FULL LOAD CURRENT
what is EIB lighting control system? what is the advantages of this system?
Why can't we parallel the secondary circuits of two voltage transformers?
please send me privious exam's queation papers of section engineer(electrical).
What do you mean by reach and reach the point of the relay?
What do you mean by a current transformer?
what is the best method of grounding in 30 MW generator?
What is Servo Ventilated Motor?
how we explain parallel paths armature winding?
What is reactive power and where it is used.