Answer Posted / om prakash narayan
Lap Length is 3/2 lap Lenths. Depends on Road
Length.Methods are 3/2. ItS Reqiured is very impotant
Reniforcement continous.
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
Explain the various stages of the project planning process in construction?
residential buildings,mixing of concrete,structural,construction material,site handling.
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
what is E
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
Howmuch bend to be provide for 200/600 BEEM
How to testing voids of filled aggregate in bitumen mix design
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
how much cement and sand required for 100sqm of wall plastering in different proportions
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
Does brick grows bigger every year?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
what is flashing?