HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / jhulzkee
Calculate the volume of the structure to be poured by its
given dimensions on plan.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What is the best type of wood glue?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
What is change order request?
whats is difference between anchorage length and development length
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
What is the general specifications of a bituminous pavement road?
Define What is an ice dam sock?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Different sizes of Hollow blocks and its weight. Thanks.
Which is stronger solid steel rod or hollow steel pipe?
Can we apply curing compound on ceiling (slab Bottom)
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
what's the formula for calculate pcc for matt(45mm aggregate)?