Answer Posted / al_m@ster
It is the phase shift between HV and LV and normally HV is
a referance and LV has a phase shift.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How the frame size of a flange mounted AC induction motor is calculated?
what is the purpose that we use PLC system in power system
Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss
anyone please send transformer parameter design formulas & details of tap changer ? plz i have interview this week its more helpful for me ?
i am going to give the JSEB,RANCHI exam for power plant,so i need some samples of papers related to that,so please send me these papers by my mail id.
How PADO software increase the efficiency of power plant?
what is the difference between online & offline caliberation of KWH meters. Can Digital meters be caliberated
whati s the sludge current in ups
What is UPS and How do you maintain the UPS Maintenance? Brief Description on UPS maintenance.
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?
What is inductance?
Make a list observation on Transformer?
What are two contours of nichols chart?
I am abt to give IOCL intrv.Plz sir guide me for IOCL intrvw (Electrical).Which subject to be consider. questions are generally asked from which subject.Plz help me out.
Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???