how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?
Answer Posted / yuy
anser plz
| Is This Answer Correct ? | 46 Yes | 19 No |
Post New Answer View All Answers
Define the various stages of the project planning process in construction.
What is meant by autocad?
Basic civil interview questionsÂ
how we calculate the vol.of wet concrete..?
What is the diameter of the 3"inch nails?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
Please design 12.5m long dubbly beam
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
For what purpose bedding is used under storm water drains, explain?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
what is parametre for M25 after 7 days strength
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants