What should be percentage of silt content in sand?
Answer Posted / vijay kumar jayswal
Not More than 8% by Volume Asper Cpwd Specification
| Is This Answer Correct ? | 74 Yes | 10 No |
Post New Answer View All Answers
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
What is c.g.i sheet which used for roof??
Which tests are performed on soil to decide the type of foundation to be provided.
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
what is the maximum number of course that can be laid according to IS code and the max height.
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
how can calculate cutting length of diamond ring
why top layer of block work shoud be full size if any cut block adjustable than another layer?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Why steel rods are produced only in even dimensions?
Define What is a projection line?
types of laps in column
does a b.tech civil engineer fresher supposed to know how to design rcc structure?