While testing the 33KV Busbar by using Hipot kit, what
should be the test voltage we have to apply
Answer Posted / gunaskaran
for ac 0.8(2E+1) normally we r doing in ac if customer
asking we can do the dc for DC (2E+1*1.414)0.8 this 1.414
is AC to DC conversion this for site for factory we have to
applie 100% voltage
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
sir, i am 3 years diploma course pass out candidate.what type of certificate can i got in marine service.
How to design harmonic filter at the project stage without nowing the harmonics levels
How does a digital electronic meter work??????
HOW THE OLTC TRANSFORMER SAVE ENERGY IN COMPARISON TO OFF LINE TRANSFORMER AND IS IT ECONOMICAL TO REPLACE THE OFF LINE TRANSFORMER TO OLTC TRANSFORMER
what should be the no load current for 3 phase ac motors ranging from 5 kw to 1000kw?
How to calculate or formula to calculate rhe power in 2 phase system ??
lamination figures
How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?
what r substations?what r there work?why voltages r incresed and then reduced during distribution of power
neutral earth resistance testing is it possible for transformer while in load condition
How can we increase fuel-power ratio of any DG set?
how is the testing of an REF relay? what are the test REF circuit having?
What do you mean by screen of power cables?
WHICH SIZE A.B.CABLE IS USED FOR 11KV.
Define delay time.