3 Core x 35 Sqmm Cable (How we measure 35Sqmm)
Answer Posted / p.h.godavary
In my answer (Answer #2), I have used the Phi symbol in the 'Area Formula'. But I find the same is appearing scrambled.
| Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
What is the Nyquist criterion regarding control systems?
In radial network the source is fed from 1 end both ends at central
What is the meaning of loop in transformer
If any HVDC line is going with positive & negative(the negative usually have return path of current with earthing electrode). Now the question is if this HVDC earthed electrode which is using as return path and earthed any nearby 400kv or 220kv AC substation equipments. which will be the impact of this on AC substation & its equipment, how severe may be this and what should be the minimum distance require between HVDC earthed electrode and AC substation equipments? It's really an high engineering level question...Dare to answer and increase your knowledge.
how brushed dc motor operating ?
i want to know how to determine that a surge arrester work properly in 11kv system. and how to test a 12kv surge arrester
what is differnce btwen lll and lllg faults
What is A check, B check, C Check & D check for a diesel Generat
Why there are some equipment(i.e:TV) that using 2-pin plug instead of three? What happen if there is current leakage? Are we going to get electric shock??
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
can u give me a brief idea about power line carrier communication ??
What is the difference between multimeter
What is meant by system?
What is the permissable nutral current of three phase system as per IS standards?
Why can't we parallel the secondary circuits of two voltage transformers?