Why Motors are generally supplied with 3 core cables??? why
not 4C??
Answer Posted / anant.katwa
4c is supplied bcz the 4th core use as spare core if one of
the core get open it may use.
Anant.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
Can you explain about TEE protection scheme?
in a silicon diode we can measure .7v in a voltmeter.but why we can't use this voltage for using?
in Contactor opearation Why there is a difference in the values of the operate and release voltage in case AC supply
how can decide the current rating of oltc
Explain the terms real power, apparent power and reactive power for ac circuits and also the units used.
IN SINGLE PH TRANSFORMER IF LEKAGE IMPEDANCE DROP IS NEGLECTED ,THE FLUX IN THE MAGNETIC CORE and the lekage flux linking a winding are a)proportional to the applied v to the winding i respectively.
Brief working principle of stabilizer,application & safety precautions
what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero
what is the constructional difference between a power transformer and potentian transformer?
what is method for testing CT
how to introduce yourself
In diesel generator how AVR get voltage to excitation. And basic diagram DG EXCITATION CIRCUIT.
In India the supply voltage is 230 volt A.C. During the negative half cycle phase becomes neutral and neutral become phase? or what will happen during negative half cycle? how the electrons flow during positive and negative half cycle?
how to select overload-relay for perticular motor 1.for D.O.L. starter 2. for Star-delta starter ????
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.