what is ment by SEBI?
Answer Posted / kundan
Securities and Exchange Board of India (SEBI)
Is This Answer Correct ? | 9 Yes | 4 No |
Post New Answer View All Answers
Denominator is 4 greater than numerator if 10 is added to Denominator,the fraction becomes 1/8.what is the fraction.
Radha,Geeta&Revathi went for a picnic.After a few days they forgot the date,day and month on which they went to picnic.Radha said that it was on Thursday,May 8 and Geeta said that it was Thursday May 10.Revathi said Friday Jun 8.Now one of them told all things wrongly,others one thing wrong and the last two things wrongly.If April 1st is tuesday what is the right day,date and month?
A batsman scores 23 runs and increases his average from 15 to 16. Find the runs to be made if he wants top Inc the average to 18 in the same match.
Find the next series: AA AB BC CE ?
sir iam asking you assistant stastical officer previous question paper
The ratio for Boys to Girls is 6:4. 60% of the boys and 40% of girls take lunch in the canteen. What % of class takes lunch in canteen.
there is a safe with a 5 digit No. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.
I HAVE APPLIED RRB EXAM. SO IWANT TO MODEL OUESTION PAPERS (DEGREE)
Numbers of animals is 11 more than the number of birds. If the number of birds were the number of animals and number of animals were the number of birds( ie., interchanging number s of animals and birds.), the total number of legs get reduced by one fifth(1/5). How many no. of birds and animals were there?
How can you make a square from two triangles?
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
During a given week A programmer spends 1/4 of his time preparing flow chart, 3/8 of his time coding and the rest of the time in debugging the programs. If he works 48 hours during the week , how many hours did he spend debugging the program.
A positive integer which when added to 1000 gives a sum which is greater than 10.06 when it is multiplied by 100 this positive integer is __.
There are 1000 doors that are of the open-close type. When a person opens the door he closes it and then opens the other. When the first person goes he opens-closes the doors ion the multiples of 1 i.e., he opens and closes all the doors. When the second goes he opens and closes the doors 2, 4 6 8 rely. Similarly when the third one goes he does this for 3 6 9 12 15th doors rely. Find number of doors that are open at last.
2 persons are doing part time job in a company(say a and b). THe company is open for all the 7 days of the week.'A' works every second day.'B' works every 3rd day.If 'A'works on 1st june and 'B' works on 2nd june.Find out the date on which both 'A' and 'B' will work together.