What is the difference between lap splice length and
development length of rebars?
Answer Posted / kamlesh chauhan
both the words technically same,only usage is different.
| Is This Answer Correct ? | 10 Yes | 38 No |
Post New Answer View All Answers
Explain what is Critical Path Method (C.P.M)?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
What is the Null Point of chimney in Power Plant
How to estabilish reinforcement Steel rolling margin for a building projects ?
Difference between pre-tensioning and post-tensioning.
What are the applications of modulus of elasticity?
List out some of the checking’s, done at the completion of construction?
how to estimate material requirement for an area of house in square feet?
What are the applications of the modulus of elasticity?
What are the applications of cad?
what is diffrence between catchment area,watershed and basin?
What is reinforced concrete?