1) what is the use of pin and plate vibrators during slab
casting? 2) how much cement bags are required for 1sqm
4inch brick wall? 3) Is it viable to provide overlap at
column , beam & slab junction. if no why? 4) if bar dia is
changing in column reinforcement , which dia bars overlap
is considered? 5) what is isolated and ecentric footing?
Answer Posted / sk
1.vibrators are used to compact the concrete placed to make
it homogenous mass removing air voids present in it.2.0.2
bags per sq.m 3.no.because it falls in critical zone
4.higher dia bar dia considered 5.isolated footing is a
footing having single column and cg of column and footing
pass from same point.
| Is This Answer Correct ? | 9 Yes | 3 No |
Post New Answer View All Answers
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
why does the most of civil engg is not intersted to going for teaching field?
what is thumb rule for calculating the size of ISMB required for a particular length of span
explain the rale of the government in the construction industry
how to calculate the strength of rebound hammer test reading in building construction ?
how lap length is increased with increase of Grade of steel?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
at which depth the construction of tunnel is economical from cost and engineering aspect.
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
What is modular elasticity?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
What is thumb rule for deep trench excavation
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.