how we can calculate cable size of 230v,1 hp single phase
motor ? panel to motor distance is 25 meter
Answer Posted / vipin
kamal is right ,after deciding the load current you ll have to consider the starting condition....
as per the IEEE regulations you ll have to consider 3 to 4 times the rated current as the starting current...as the rated current is coming around 6 amperes you can select a CB of 20A DP or SP. A 4sqmm cable will be std for the 1 hp pump.. you will have to verify with your supply company rules for the size of cable to be used for the designed value of circuit breaker.
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
I have a small system with two motors that are running on 380 vac, 60 hz. These motors are expensive and I usally get them from Brazil. I am adding another motor to the system, but I want to purchase a 480 vac, 60 hz motor to use. It will be on a VFD that is rated fro 380 thru 480. Is this posible and will I have to use a larger motor and derate it?
HOW WE CALCULATE CURRENT IF THERE ARE NOT PRESENT ANY AMMETER OR MULTIMMETER??????
what is the meaning of vcc
What is pole of the system?
What is speed mode?
compare between starting charactristics of synchronous motor with those of 3Q Squirrel cage induction motor
in dc shunt motor if field winding is shorted then
1.what is the funtion of chiller primary & scondary pumps. 2.what is the use of distribution lines & Types. 3.what is the use the thermal power stations & how much capacity.
why T/F winding temp measurement cts are odd secondary current ie,109A/1.2A/1.4A?
If a transformer primary winding operates at 240v, the secondary at 120v and the load is 1500w & the transformer is rated at 92% efficient, what's the current flowing through the primary winding of the transformer? What is the formula for finding this?
What are the conditions for sustained oscillator or what is backhouse criterion?
What is error of a measurement?
How impulse levels are calculated that for 11kV impulse is 75kvp, for 24kV impulse is 125kvp ?
How would your past experience translate into success in this job?
HOW CAN I GET 5CORE HO7 CABLE SIZE IF I HAVE 1800A?