Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

whatis knee point ?

Answer Posted / ravi agrawal

A point beyond which 50% increase in forced function results in 10% increase in response

Is This Answer Correct ?    1 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)

1559


what type of earthing do for dry fissure rock?

2429


We need to current density & short circuit calculation at 65kA for aluminium & copper busbar.

1732


What are the advantages of instrument transformer?

1152


how many types control panel of a 132/33 kv substation

2639


Explain in brief description about the operation of DG sets.

2435


Write a note on Treatment for electric shock.

1901


Define delay time.

1082


What is the distance between body earthing and neutral earthing.?

5001


how braking & making capacity of circuit breaker are calculated?

2294


difference between servo motor and synchronous motor

2322


how copper and aluminium wires or cables are choose for current rating? please provide copper and aluminium wire selection chart for different current rating ?

2018


How to choose the vector group for the step up and step down transformers??? Tell me the which vector group is suitable for step up and step down transformers and whats the reason to choose and whats the benefits???

2271


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

963


If we need 4c× 50mm sq cable but it's not available so we can pull 4c×25mm sq two cables?

1402