A vertical plate and a horizontal plate are suspended in an
open room. Both are heated to the same temperature. Which one
will cool first?

Answer Posted / vivek

vertical one,since it is in less contact with grond
compartive to others.

Is This Answer Correct ?    1 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which impurities form hard scale and which impurities soft scale ?

645


How to Start Boiler Electrical Feed Pump? I mean to How to Charge it?

1452


what is the responsibility of assistant manager in welding in goa shipyrad company?

2749


how to size an expansion tank in chiller system ?

1637


What is cri pumps & mechanical sael

3601






If any machinery or trnsmission needs periodic and regular lubrication what is the best method to give?

1285


Discuss how to prepare the M/E in the standby condition

1534


Why would you use hydraulics rather than pneumatics?

603


Which element is added in steel to increase resistance to corrosion ?

750


Explain the difference between mill and mill-drill?

580


Explain the difference between hydraulic oil and engine oil?

691


Can you use motor oil in a hydraulic system?

646


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1387


how to measure static charge in processing of expandable polystyrene. explain - Units of static charge

1525


Crankcase oil mist detector

1538