why main steel is to be reinforced in shorter direction in
case of slab?
Answer Posted / t.panneer selvam
Because Bending Moment develope in shoter direction
| Is This Answer Correct ? | 53 Yes | 14 No |
Post New Answer View All Answers
what post do you prefer to work in this company and why do you think you can serve better in such position?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
When was the first motorway built in england?
Write short note on construction programme for pile foundation.
What is the difference between linear dimension and aligned dimension?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
How to check slab shuttering level.? Or check list for slab ?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Advantage of Aluminum form work in terms of activities can be skip and cost too
how much cost of single coat 20mm thick plastering per sqre meter
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what is the use of beam end forces while using a staad ? wha they are show
What is the zero value in quantity surveying