i have a problem in report which is at production server
what will i do?
Answer Posted / lavanya
If any error arises in the production a CR ( Change Request
need to created ) , that shd be duly approved by the
superiors , once this is done then that CR shd be worked in
the development server, and then again goes throguh the qlt
and then moved to production
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What are control tables?
How to give programe name as input in BDC report of abap ?
What is bdc programming? : abap bdc
What is time constraint ? : abap hr
wat is the difference between A-gate & W-gate?where are they used?
When you prefer lsmw?
What is an rfc?
The max number of calling modes stacked at one time is?
Which one is better joins or views and why?
any one can tell me which is the tables can store in ddic plese dont say db02l,please give me different ways of resideing the tables ?
when run my program in se38 it was showing output, when i take background execution and giving printer details it was shoing out put. but in SP01 when i give the Spool Request Number it was showing not yet processed entire page why it happens i dont know please give me a solution.
Of the two call transaction and session method, which is faster?
Business scenarios related to your objects( In my case -Rulebook and Pricing work flow)
What are the different types of parameters? How can you distinguish between different kinds of parameters?
Setting up a BDC program where you find information from?