Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Which pavement is advisable in India?(Flexible or Rigid)

Answer Posted / upenderreddy

both are advisable according to the traffic volume,cost of
construction and cost of maintanance.for rigid pavement
life will be more,maintanance cost will be less but the
cost of construction will be more.for flexible pavements
cost of construction is less but maintanance cost is more
and its life is less,visibility during night time is less
compared to the rigid pavement.

Is This Answer Correct ?    11 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the different theories of failure under static load?

1295


Which type of plywood & sizes using in construction projects ?

1055


how to disign cuplock shuttering and it's matireal requirement snd any related web site

3022


Explain what is Hybrid Foundation?

1167


what is the difference b/w full length and cutting length?

2220


Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?

1865


how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6

6238


Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted

1721


how do you stabilize a waterlogged area in road construction

6775


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1809


what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.

2326


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2560


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

2140


for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete

1929


What is absolute pressure? How absolute pressure is calculated?

1132