Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Which type of power plant is more easier to produce electrical
power at economical condition?

Answer Posted / harsh

installation wise nuclear power plant is most costly but it
reaps long term benifits
when operation and installation both are considered,
thermal power plant is the most efficient

Is This Answer Correct ?    5 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the operation carried out in thermal power stations?

1033


how to define tell me about self

1990


how is the testing of an REF relay? what are the test REF circuit having?

1998


What is the efficiency during maximum power transfer?

1218


What is difference between YNyn0 and YNyn ??

2541


How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?

2256


circuit diagram of trip circuit supervision relay

2042


What is the meaning of dedicated earthing?

2153


why they were using TRIAC instead relay in some controllers and what is the advantages.

2014


HOW TO CALCULATE CAPACITOR BANK OR HARMONIC FILTER CALCULATION

2301


how can we find thae value of capacitor for single phase motor. what is difference between starting capacitor and running capacitor.

2362


dg started in plc mode and load taken later one battery terminal connection will be disconnected by loose connection what will happen for dg and shall we connect battery terminals while dg in load time?

2058


What is the procedure/activities to be taken to inject the current more than 2000A by using 2000A Loading Transformer?

1996


Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.

1581


Can we use 230VAC, 63A MCB for 120VAC, 63A supplied heaters load?

1467