Answer Posted / priya
In the construction of RC buildings, due to the
limitations in available length of bars and due to
constraints in construction, there are numerous
occasions when column bars have to be joined. A
simple way of achieving this is by overlapping the two
bars over at least a minimum specified length, called
lap length. The lap length depends on types of
reinforcement and concrete. For ordinary situations, it
is about 50 times bar diameter. Further, IS:13920-1993
prescribes that the lap length be provided ONLY in the
middle half of column and not near its top or bottom
Is This Answer Correct ? | 28 Yes | 2 No |
Post New Answer View All Answers
what is the Asfalt test?in road constraction..?
in design case of structural member best suitrable percentage of steel limit is what
For Wet Mix Mecadam design what is Optimum moisture content
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
for pretensioning which will yield first and same for post tensioning?
how can we calculate steel value, depending on load
Whats the meanig of ,'K' VALUE in the case of soil.....
what is the types of door's wood?
rimmer in pile foundation
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
What are the techniques to measure road difference?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
How foundation is designed, Column design and beam design
What out turn civil works