Answer Posted / sjtbehera
Lap length are recquired when distance of structure is
larger than the length of Bars.
It is recquire to bind the two bars so that load can
carried.
Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
what is tension footing?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
Calculation of curtain wall of box culvert
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
how to find hardness of water?why it should be determined?
What is the strength of cement?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
what is the list of building construction equipment & teir output?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
How many cum of 9.5mm stone in 1 ton ?
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
about higyway engineering
How foundation is designed, Column design and beam design