The following tests to be done during commissioning.
1.Duster value.
2.PI test The value should be above2.o
3.Tan delta test.
4.Ratio test.
5.short ckt.impedance test.
6.vector test.
7.IR test.
8.Polarity test. Thats are sufficient.
BDV value of TRANS OIL should not be less than 50 kv.
IR value of oil cooled trans should be 100M w.r.t gr.and HT
to LT also 100M.PI test should carried out value min 1.5 to
2.0
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
what r PID controllers?why they r used?what is there purpose?plz Explain in detail
WHICH SIZE A.B.CABLE IS USED FOR 11KV.
how to know the diffrential relay setting of 06mva step- down (delta-star)transformer?
how to calculate the power factor when instantaneous voltage and current has harmonics in it ?
Why magnetic flux produces an induced current?? what is the detailed procedure ?? ans plz
Whar is the KvA rating of 33Kv substation & actual kv rating of power generaating station.
transformer spections :: input voltage 0-110-230v; output volage 0-10-12-14v; amp=3A using CRNO CORE, capcaity=50VA primary turns = ? ; secondry turns =?
How to know th details about an electrical Drawing ? Please mention the easy method.
Please explain me about Relay curves and their sources to read ?
What is the maximum breakdown voltage of 11KVA and 66 KVA power line and how it is calculated?
Control cables in S's will carry 1000v which is AC R DC? Pls answer meĀ
Instrument connected to a single phase supply
we need a ntpc previous papers
why the frequency and voltage in india is 230v and 50HZ. when compared to USA say 110v and 60 HZ.
Which cable is use for rtcc control panel