we are using three transformer 33000/430 vac for three
separet block.all three transformer have three LT panel
separetly. can be Interconnected all three panel through bus
coupler. this is permissable or not by state electricity board.
Answer Posted / bk
I agree with Ans.-1
Thanks
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.
what is the meaning of number in (11, 31, 61,14, etc. CDG11, CDG31, CDG61, DDT32
i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
What is slip in an induction motor?
What is the function of NER and NET?
what is maxemo work permit procedure
why do we measure VIBRATION in -24vdc and why we adjust gap voltage -9vdc to 10-vdc? i am trying to get this information since 5 years, yet i haven't get reliable answer, i hope i can get from you.
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
What is the main purpose of c.f.b.c.boiler
how does an encoder work???
How much earthing frequency is capable?
i have interview in Pepsi company what type of question will ask please send the question and answeer
What is the criteria that generally follow by distribution licenses to fix contact demand of their industrial customers?
what causes contact chatter when there is no demand on the air conditioning unit?
PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com