In three pin socket normally three pin in between three
pins earthing point is more thickness why?
Answer Posted / prashant
when ever we talk about fault current. it always means a heavy current. fault current always needs a path to be grounded. since it is large so it obviously needs conductor having low resistance. since if resistance is high then on passing current through it will produce heat by formula (I^2R). again by seeing formula of resistance
R=P*l/a
increasing the area will reduce the resistance and hence reducing heat energy.
that is why earth wire is kept thick...
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
How many types of colling system it trformers?
how we calculate torque ? how we improve it ?where torque will either motor or generator ?
why the starting voltage drop in a cable needs to be limited?what is percentage of the voltage drop allowed during starting?
a 100mva,400/200v transformer has leakage impdce of 10% draws a steady state line currentof---------------
what is 30-phase of transformer
how can see the ac indoor or out door ac which Tr
state working of halogen lamp?
What are the basic component of a cro?
During FEED, you will have all the information with regards to cable. How will you calculate the MTO for MV and LV Cables? what are your considerations?
what is the ground fault relay,which purpose it will be use,clearly tell me plz
Dear sir, my knowledge about cable size determination is limited. Though I read examples I could not calculate the Cable size required for electric driven pump 40 KW, 380 Volt, 50 HZ, 50 meter from transformer and it is three phase star delta starting. Please help as there is no one in my surroundings to help.
what is the relation between knowing of the distance between power transformer and the capacitor feeder in case of parallel operation
HOW TO CHECK THE VECTOR GROUP OF A TRANSFORMER YD11?
what is mean by parallel operation of permanent magnet generators
All tape of electrical questions Answers tape of motor transformer e.o.t crane