How can PS be linked to COPA? How will the settlement take
place in this case (when PS is linked to Controlling
through COPA)

Answer Posted / ashish

CCA/ PCA will give actual costing of project that may led
to Project cost (Planned/actual)

Is This Answer Correct ?    1 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is project coding mask?

619


Are there any positive aspects of the risk identification process?

594


What is the accounting and logistical information that gets defined with a project definition?

610


What is wbs?

580


How can we set the options for capacity reports cm01?

588






What is work breakdown structure (wbd) and how does it affect the work estimates of tasks/activities?

793


What qualifications are required to be an effective project manager?

564


List different types of time profile

624


What are the knowledge areas relevant to doing a project?

618


List the parameters of project system.

555


How is the budget for the project controlled? Tell the menu path for the place where it is controlled.

549


Why does a pm need to be very proactive?

646


Do you think professionalism and integrity are essential qualities of a pm?

616


How do you perform user authorization in sap system using grc access control?

597


How in the project time schedule represented most often?

569