How can PS be linked to COPA? How will the settlement take
place in this case (when PS is linked to Controlling
through COPA)
Answer Posted / ashish
CCA/ PCA will give actual costing of project that may led
to Project cost (Planned/actual)
Is This Answer Correct ? | 1 Yes | 8 No |
Post New Answer View All Answers
What is project coding mask?
Are there any positive aspects of the risk identification process?
What is the accounting and logistical information that gets defined with a project definition?
What is wbs?
How can we set the options for capacity reports cm01?
What is work breakdown structure (wbd) and how does it affect the work estimates of tasks/activities?
What qualifications are required to be an effective project manager?
List different types of time profile
What are the knowledge areas relevant to doing a project?
List the parameters of project system.
How is the budget for the project controlled? Tell the menu path for the place where it is controlled.
Why does a pm need to be very proactive?
Do you think professionalism and integrity are essential qualities of a pm?
How do you perform user authorization in sap system using grc access control?
How in the project time schedule represented most often?