I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / veeramani amanthan
hi friends thank you your reply to me but now confushing
wich one i take 14 days or 28days please conform
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
How much is the cover for slab?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
How much material will consume for following specification water tank (9*7.5*6 feet)?
What are the reasons for geotechnical site investigations in uganda?
3. What are the disadvantages of your present job, things you do not like about it?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
in plate load test what is the thickness of plate 20mm 5mm 50mm none
Floor tile measurement? Wall to wall or skirting to skirting
In block work seawalls what is the purpose of slip joints?
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Which is the direction of negative angle?
is concealed wiring a problem in fly ash brick wall?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?