I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / veeramani amanthan
hi friends thank you your reply to me but now confushing
wich one i take 14 days or 28days please conform
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
How will you Engage Labours on Site?
How to make a c++ program that converts any base to base 10?
Advantage of Aluminum form work in terms of activities can be skip and cost too
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
quantity of material needed for rubble stone masonry for 1:4 and 1:6
specifications of fe500 steel
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
In cement concrete how to check a quality of material also proportion of material at site ?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx