I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / vinod
as per curing period will b 7days r 28 days the same can be
used for de shuttering
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
who to find building iron rod strenth
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
what is the difference b/w full length and cutting length?
What is the Null Point of chimney in Power Plant
How much cement and sand required for 9"brick wall per square metre
Why should pumping be not used in case of concreting works?
what else we can add rather than admixture in concrete to reduce the cement quantity?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the life of anaerobic Digester if it is used for municipal solid waste digetion.
what is m30 in concrete tiles
Difference between lime, distemper and plastic emulsion?
Which ratio use for cement selery???
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
What is reinforced concrete?