I'm puting roof slab M20 Design Concrete,Twoway slab how
many days wait for remooving of shuttering?
Answer Posted / vinod
as per curing period will b 7days r 28 days the same can be
used for de shuttering
| Is This Answer Correct ? | 4 Yes | 4 No |
Post New Answer View All Answers
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
how many type of admixtures for water stored structure?
What is meant by autocad?
what is tension & compression of steel bending.
cause of cylinder test failure
material used for mendrel use to bend epoxy coated rebar
what is the mix design for M:60 with micro silica andmetakaoline?
What is change order request?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
pls mail some more tecnical qustions at msaranya2610@gmail.com
What is type failure of road surface? how to repair the failure of road surface?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
what is the types of surveying?which type of survey carrying for type of work?
Soil bearing capacity formula
how to caliculate required amount of cement and sand required for 1cu.m.