How the Transformer oil testing is done & Why oil dielectric
goes LOW & what is solution for that ??
Answer Posted / pillay
The sample oil to be tested for dielectric test is collected
and put into the tester and the average of 6 tests is
taken.The minimum withold voltage is as per local regulations.
causes of low dielectric results are usually exposure of the
insulating oil to moisture through the breather or there is an
exposed opening, poor quality oil being used. high acidic
content.The insulating oil should be replaced or dehydrated.
breathers silica gels should be maintained good all the time
and check for any leaks or any exposure to atmosphere must be
rectified.
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
Incoming line 11kv And transformer capacity is 2500kva. Consumption load is 1300A. Then fuse capacity is 11kv line.
How you calculating the 30 Hp 3 phase AC motor of power what size of cable is used for this motor?
what type of questions are asked and howmwny questions belong this catagory?
what happen when increase or decrease size of lamp,light.glass.
Why we specify TNC switch with 1NO 1NC ,2NO 2NC ? how we get connection.?
What is Percentage impedence of a transformer? why it is expressed at a percentage? what is the importance of percentage impedence in case of a transformer?
i am gng to visa interview this july i have 4 backlogs gre 1010,toefl 75,pls give me the tips pls pls
How is the percentage impedence of a transformer fixed at design stage???
ii) A shunt motor supplied at 230V, runs at 900 rpm when the current is 30A. The resistance of the armature is 0.4 ohms. Calculate the resistance required in series with the armature to reduce the speed to 600 rpm, assuming that the armature current is then 20A. [12]
10 Mtr Hight of Lighting Arrestar how much area coverd??
How to megger test 11 kV cable and the acceptance IR value
What is mean by Sensitive Earth fault & what are the effects
how calculated Transformer losses.
I need bhel electrical test pattern & paper
what is the Connected Load (kW) or Contract Demand (kVA)of mahindra nasik plant??