Which pavement is advisable in India?(Flexible or Rigid)
Answer Posted / 03265523
rigid pavement is used for water logged areas, but
maintenance cost is more when compared with flexible
pavement and maintenance work is difficult. so my advice is
flexible pavement is better
| Is This Answer Correct ? | 8 Yes | 6 No |
Post New Answer View All Answers
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
to minimize budget cost of building , what can i do
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
how much of the strength comes from post-production curing
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
Explain the latest method to detect a crack in a building?
What is the ideal size of the living room ranges from small to large size?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
what is the weight of 12mm aggregates?
In jack arch floor, the rise is kept?
how many material required for brickbat water proofing of toilets.