Do you have different BOMs for a material in different plants?
Answer Posted / santosh sharma
well,
we have different BOM for different-different plant.
because in another plant there are differet material
sothat there are create the BOM's different types.
Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
SPRO path for order, confirmation or requirement class.
In sap-pp what are the costing parameters?
In lsmw which is most important step?
How did you configure the payscale structure?
How do you integrate HR (employee) with PP?
How you get the ticket?
What is meant by payscale structure?
What is MRP procedure
What is the difference between the fixing type 1, 2, 3, 4?
Overlapping and splitting, where do you assign?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
what does SAP business workflow do?
What is finite scheduling?
In the monthly lot size proc, how to generate lot at the end of Period?
Explain why there is need of production version?