How do you estimate the effort for your project? Where is
the estimation procedure documented?

Answer Posted / shridhar

Depending on the project you work for, multiple Estimation
techniques are used. Some of them are:

1. Work Breakdown Structure
2. Function Point Analysis.
3. use Case Template

In #1, you breakdown the project into deliverables and the
activities associated with those deliverables and then each
activity is estimated.
Total estimate is total of all the activity estimates.
Further yto this, contigencies are added by PMs.
2. In Function point Analysis, you need to go into a bit
deeper and refer to the input data/output files and then
estimate the function points for each file/program. It was
industry standards multiplication factors. Total FPA counts
multiplied by multiplication factor provides you a total
project estimation.

3. Use Case is more based on the client's needs and
deliverables.
Depending on the functionality provided in the
application/project, it is estimated.

Use case is mainly used for development projects, though
others can be also used for devp/maintenance kind of
projects.
FPA provides different estimation mechanism within it for
development and maintenance projects. (having different
multiplication factors).

I use WBS estimation technique, which I find easier as
compared to other approaches.

Is This Answer Correct ?    12 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Tell about current project ?

2448


How do you ensure that your project plan is available for others to see? Where will you find the plans of other projects executed (in the past or currently) in the center?

2240


How would you deal with a bug that no one wants to fix? Both the SDE and his lead have said they won?t fix it?

3086


Did you used crystal reports? Do you have sufficient knowledge on crystal reports?

2348


What training have you undergone in project planning?

3513






create a flow diagram up to 2 levels for hospital management

3421


Explain dll hell?

854


How do you create the Software Project Management Plan (SPMP)?

4273


Please, i am a final year student in nigeria and i have a project on pension fund administration and i need help in starting.

2070


What is the project management structure in your project? Is a PL assigned to the project?

2238


How do you rate yourself in c#,vb.net,Asp.net,oracle,sql server ?

5168


Explain the various activities you do (as a PL) when the project is started up.

2558


Write the test cases for instr function?

807


Test the save dialog in Notepad?

4377


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

6801